ePetition details

Harper Lane Bridge works

We the undersigned petition the County Council to implement a permanent solution to the narrow bridge at Harper Lane that does not cause the severe congestion caused by 3 way traffic lights. The preferred solution is a wider bridge, but failing that a separate foot bridge for bikes and pedestrians is acceptable.

The short term solution for 6 months of 3 way lights that is proposed until road works are completed is already causing severe traffic chaos. The long term solution proposed is also 3 way lights with a pedestrian and bike path and single file traffic over the bridge. Obviously no analysis of traffic flows was done and traffic will only get worse with the Bloor Housing Development on Harper Lane.
The Council have to come up with an acceptable long term solution which either widens the existing bridge or adds a 2nd foot bridge with ramps up either side for bikes and prams.

Started by: Scott Maclachlan

This ePetition runs from 16/01/2019 to 13/03/2019.

976 people have signed this ePetition.